DESIGN AND CONSTRUCTION DOCUMENTATION

DESIGN AND CONSTRUCTION DOCUMENTATION


Description

Developing Series of Drawings:
  • Construction coordination plans
  • Plumbing & electrical coordination plans
  • Gas & ventilation coordination plans
  • Equipment schedules
  • Related series of elevation and detail plans
Prepare a planning document, which describes in detail the criteria by which the food facilities are designed. Included are the following elements: 

  1. Food storage system – frozen/raw/dry/cooked – FIFO
  2. Food processing, preparation, production and packaging
  3. Food temperature control systems
  4. Quality control systems
  5. Food safety programming 
  6. Logistic/ delivery programs
  7. Ware washing 
  8. Waste handling 
  9. Adjacency requirement 
  10. Space estimates 
  11. Budget estimates 
  12. Project schedules 

Share by: