FACILITY PROGRAMMING

FACILITY PROGRAMMING


Description

A tabulation calculation of utility service information for each equipment item and shown on facility drawings, include the followings: -
  1. Hot and cold water: Flow rate or pipe size; pressure and temperature
  2. Electrical: Voltage, phase and Load(KW or amps) 
  3. Gas: (load –BTU/hr) and pressure requirements
  4. Exhaust and Make-Up air flow volumes

Share by: